The Miri Combined Cycle Power Plant (CCPP) stands as a strategic cornerstone of Sarawak's Post COVID-19 Development Strategy 2030. Developed for PETROS Power Sdn. Bhd., this power plant is an important pillar in Sarawak’s mission to achieve long-term energy security and industrial growth. The Dual Challenge...

A jetty structure is designed to carry high axial loads and bending moments. For the jetty project in North Kalimantan, Indonesia, spun piles were chosen over other foundation systems due to the high concrete strength, superior bending resistance, lower maintenance cost, and better durability. These...

In today’s fast-paced construction world, time is everything, as delays can affect both project schedules and costs. At ICP Piles, spun piles can be installed just three days after casting — fast, reliable, and with high concrete strength and quality. This makes them ideal for...

At ICP Piles, we don’t just focus on what we build—but how we build. With rising climate concerns, it’s clear that the construction industry needs to do better. That’s why we’re taking real steps to reduce our impact, not just talk about it. We’ve been leading...

At ICP, our spun concrete piles are engineered with a hollow inner core for a reason. The spinning process pushes the concrete outward, forming a void at the center. At the same time, it creates a dense, high-strength outer layer that helps transfer the load...